4、如果在使用過程中,因操作不當導致加熱板進水,應首先聯系廠家進行維修。如果需要進行應急搶修,可將加熱板上蓋板打開,先將水倒出,然后將電控箱設置為手動操作,加溫到100℃,保持恒溫半個小時,將線路烘干,在在手動狀態下進行皮帶膠接。同時應及時聯系生產廠家,進行線路的整體更換。
1, vulcanizing machine storage environment should be kept in dry, well ventilated environment in use, so as not to rust.
3. If the working environment is wet and water-rich, when the vulcanizer is dismantled and handled, it should be padded with articles on the ground, and do not let the vulcanizer contact with water directly.
4. If improper operation results in water inflow of heating plate in the process of use, it is necessary to contact the manufacturer for maintenance first. If emergency repair is needed, the heating plate cover can be opened, the water is poured out first, then the electric control box is set to manual operation, heating to 100 C, keeping constant temperature for half an hour, drying the circuit, and bonding the belt in the manual state. At the same time, manufacturers should be contacted in time for overall replacement of lines.
6. After each use, the water in the water pressure plate should be cleaned, especially in winter. If the water can not be cleaned, it will often lead to premature ageing of the rubber and reduce the service life of the water pressure plate.
7. The correct way to release water is to carry out the vulcanizing machine before it is removed. If the water is released after the machine is dismantled, it may cause the water in the water pressure plate to not be discharged completely.